
POLICE SECURITY
Police Security Dover 1000 Lumen Rechargeable Flashlight USB-C Charging Cable Included, Slide Focus, 6-Hour Runtime, Impact Resistant w/Belt Clip.
£69.62
£116.03
-
Order within to get between
-
Tracked Shipping on All Orders
-
14-Day Returns
- Secure Payments
-
24/7 Customer Support
Description
- Ultra-Bright Performance: Delivers a powerful 1000 lumens with a beam distance of up to 210 metersideal for mechanics, automotive work, and emergency situations.
- Long-Lasting & Rechargeable: Equipped with a high-capacity 18650 2600mAh lithium-ion battery for up to 6 hours of runtime on Low mode. Rechargeable via included USB-C cable.
- Versatile Lighting Modes: Features 3 adaptable settingsHigh (1000 lm), Low (250 lm), and Flashfor various lighting needs, plus Slide Focus for adjustable beam control.
- Durable & Portable: Impact resistant with a compact 6.65" body and integrated belt clip for easy everyday carry. Built to handle tough work environments.
- No stand alone batteries are sold with this product
Police Securitys Dover rechargeable, 800 lumen LED flashlight, is optimal for automotive technicians and other professionals who demand long-term flashlight performance. With our Quik Connect USB charging system (cable included), this light functions with a 18650 rechargeable lithium-ion battery delivering up to 11 hours runtime. With high, low, flash modes and slide focus, this flashlight is immediately adaptable to a variety of situations.
Shipping and Returns
- We offer tracked shipping on all orders. Tracking information will be shared as soon as the order is dispatched.
- Please check the delivery estimate before adding a product to the cart. This is displayed for every product on the website.
- Available shipping methods and charges will be displayed at the time of checkout, depending on your exact location.
- All customers are entitled to a return window of 14 days, starting from the date of delivery of the product(s).
- Customers are advised to read our return policy for details of the return process, eligibility, refunds as well as cancellations or exchanges.
- In case of any issues or concerns about Shipping or Returns, please contact us and we will be happy to help.
Police Security.
Police Security Dover 1000 Lumen Rechargeable Flashlight ...
£69.62
£116.03